Project: Data Centre, London Docklands
24/7, 365 days a year response
Response for UK is within 4 hours
Data Centre, London Docklands
- Replacement 4x 1200kW Turbocor machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre
Challenges:
- Working within a LIVE datacentre environment with no disruption to services for entire duration of project
- Very tight basement location very similar to Smithson Plaza in a multiple tenancy building
- Strip down of plant meant attention to detail was paramount
- We were not allowed to impact any aspect of the building, we had to be ‘invisible’ to the operation of the building.



CLIENTS














Latest News
Project: Large UK Data Centre, Cardiff
24/7, 365 days a year response Response for UK is within 4 hoursLarge UK Data Centre, Cardiff Replacement 2x 1300kW Air cooled machines, Pumps, controls and electrical infrastructure on a critical LIVE datacentre Challenges: Working within one of the most critical UK...
Project: 41mW Battery Storage Centre
24/7, 365 days a year response Response for UK is within 4 hours41mW Battery Storage Centre, Birmingham Critical close control temperature and humidity N+1 system. TRANE Indoor air cooled chillers, 6x battery room AHUs, mechanical and electrical services. 150m3/hr...






Devon Address
Unit 2,
Great Western Place Station Road, Burlescombe,
Tiverton,
Devon,
EX16 7GW.
Cornwall Address
Drinnick House,
St Georges Road,
St. Austell,
Cornwall,
PL26 7XR
Bristol Address
Domus House,
28 Old Street,
Clevedon,
Bristol,
BS21 6BY
Cardiff Address
Portland House,
113-116 Bute Street,
Cardiff,
CF10 5EQ